INGEMMET licence 070011405
13,434 g mined
โ$2.04M
2026 operational track
Cumulative production figures from the Madre de Dios concession, recorded up to and including 30 May 2026 (169 active extraction days). Disclosed as historical operational data, not a projection.
13,434.8 g
Gold extracted
169
Active extraction days
79.5 g
Average per active day
โ 2.04M USD
USD equivalent of extracted volume
Source: operating-entity production ledger, cumulative to date.
Operating economics
OPEX, per cubic metre processed
โ USD 5.92
Includes labour, fuel, consumables, plant maintenance
Revenue, per cubic metre
โ $14.02
Calculated at 0.1 g/mยณ ร spot $4,359.72/oz (September 21, 2026); function of grade and prevailing gold price
Modelled break-even gold price
โ USD 1,842 / oz
Reference figure; actual sensitivity varies
Daily processing capacity, design
up to 8,000 g of gold
At full nominal plant utilisation
Effective operating envelope
16 hours / day, 25 days / month
Standard alluvial operating pattern
Asset
AYNI Gold is linked to an operating alluvial gold-mining concession in Madre de Dios, southeastern Peru. The concession covers 8 kmยฒ and is held by Minerales San Hilario S.C.R.L. under INGEMMET licence 070011405. Equipment is installed and operational; production evidence and supporting documents are available in the data room.
Geology
An independent Phase 1 scoping study (2025) characterises the deposit as a near-surface alluvial system with measurable gold content concentrated in the upper five metres of overburden. Sampling supports a conceptual exploration target in the order of 9โ11 metric tonnes of gold across the concession area. This is not a declared mineral reserve or resource.
Modelled recovery at the current plant configuration is approximately 80%.

News
Production numbers, plant uptime and equipment status are reported in the periodic Operational Dispatches.


