Pit exploration and haul road work

The team at Minerales San Hilario continues to explore an area for a possible additional pit. Work is also underway on a parallel haul road, equipment for recovering very fine gold, and preparations for production drilling.
Exploring an additional pit area
Exploration continues in an area being considered for another pit. The work will help the team assess the ground and plan how that area could be developed.
A parallel route for haul trucks
The team has laid fill for a road parallel to the existing route between the pit and the processing complex. Together, the two roads are intended to create a circular route for haul trucks. This would allow trucks to keep moving between loading and processing more frequently, rather than relying on the same road for traffic in both directions.
Fine-gold recovery equipment
The team continues to work with a laboratory in Lima on the technical specification for equipment to recover very fine gold. The specification will define what the equipment needs to do before it is manufactured, with the aim of capturing gold particles that require a more specialised recovery process.
Preparing for production drilling
Potential production-drilling points are being marked out. Setting out these locations gives the team a basis for organising the drilling work across the area.